6.11.2017 | 00:05
Day 2. Mobile alabama to pensacola florida
Today began with fog. I had to wait for few hours at the hotel until the fog was cleared. When I came to the mobile tunnel there was some construction so I could not ride through. I needed a ride through the tunnel. I tried uber. I have never used it before. It worked well. I ordered a big car for me and my bike. It picked me up. Lovely Indian woman that took me over the bridge.after she let me out at some has station I. Ride in good weather all the way to Pensacola. Lot of hills but no bike path until I reached the Florida border.
Bloggar | Slóð | Facebook | Athugasemdir (0)
Bloggfærslur 6. nóvember 2017
Um bloggið
Jón Eggert Guðmundsson
Heimsóknir
Flettingar
- Í dag (19.4.): 0
- Sl. sólarhring:
- Sl. viku: 1
- Frá upphafi: 0
Annað
- Innlit í dag: 0
- Innlit sl. viku: 1
- Gestir í dag: 0
- IP-tölur í dag: 0
Uppfært á 3 mín. fresti.
Skýringar